top of page
275051437_938740886815828_3480950216642859596_n.jpg

A high-flow 500GPH 12V submersible / inline pump with an extended wire lead — ideal when pump placement is remote from the control switch. Marine-grade wiring and anti-airlock protection.

Specifications

  • Voltage: 12V DC

  • Flow rate: 500 GPH (31.5 LPM)

  • Use: submersible or inline

  • Outlet: 3/4" hose barb (19mm)

  • Lead: extended length (5m)

  • Anti-airlock: yes

  • Marine-grade wiring: yes

  • Warranty: 4 years (UK authorised supply)

Supplied by E.P. Barrus Ltd, the exclusive UK Seaflo distributor.

Seaflo Submersible Pump 12V — 500GPH (Long Lead)

£44.00Price
VAT Included
Quantity
    No Reviews YetShare your thoughts. Be the first to leave a review.
    bottom of page