top of page
275051437_938740886815828_3480950216642859596_n.jpg

A 280GPH 12V submersible / inline pump with a longer wire lead — useful when the pump sits further from your control panel or battery. Can run submerged or inline between hoses.

Specifications

  • Voltage: 12V DC

  • Flow rate: 280 GPH (17.5 LPM)

  • Use: submersible or inline

  • Outlet: 1/2" hose barb

  • Lead: extended length (5m)

  • Warranty: 4 years (UK authorised supply)

Supplied by E.P. Barrus Ltd, the exclusive UK Seaflo distributor.

Seaflo Submersible Pump 12V — 280GPH (Long Lead)

£24.00Price
VAT Included
Quantity
    No Reviews YetShare your thoughts. Be the first to leave a review.
    bottom of page